East Road, Longhorsley Residential Development
Sparton Civils is proud to have played a key role in the successful delivery of a high-quality residential development in Longhorsley, undertaking a comprehensive package of civil engineering and groundworks from the earliest stages of the project through to infrastructure completion.
Our works commenced with the bulk excavation and stripping of topsoil across the site, preparing the development for construction and establishing formation levels in accordance with the project design.
Following the enabling works, our team carried out the installation of the site’s adoptable roads and sewer network, including foul and surface water drainage systems, ensuring all infrastructure was constructed to the required specifications and industry standards.
As the development progressed, Sparton Civils completed the foundations for nine luxury residential properties, delivering precise excavation, concrete placement and substructure works to programme. In addition, we installed all associated plot drainage systems, connecting each property into the wider site infrastructure.
A significant element of the project involved the construction of the surface water attenuation system, providing sustainable drainage and effective stormwater management for the development.
To complete the external infrastructure, our operatives installed kerbs, footpaths and associated hard landscaping, creating safe and durable access routes throughout the site and preparing the development for the final phases of construction.
This project demonstrates Sparton Civils’ ability to deliver complete groundworks and infrastructure packages, combining technical expertise, experienced personnel and a commitment to quality, safety and programme delivery from initial site clearance through to completed roads and external works.